Pages that link to "Item:Q2892307"
From MaRDI portal
The following pages link to A heuristic approach to the multi-period single-sourcing problem with production and inventory capacities and perishability constraints (Q2892307):
Displaying 12 items.
- Integrating deterioration and lifetime constraints in production and supply chain planning: a survey (Q296854) (← links)
- A heuristic for emergency operations scheduling with lead times and tardiness penalties (Q322544) (← links)
- An efficient heuristic approach for a multi-period logistics network redesign problem (Q458939) (← links)
- A facility neighborhood search heuristic for capacitated facility location with single-source constraints and flexible demand (Q519091) (← links)
- On solving the multi-period single-sourcing problem under uncertainty (Q926314) (← links)
- Greedy approaches for a class of nonlinear generalized assignment problems (Q968176) (← links)
- Asymptotic analysis of a greedy heuristic for the multi-period single-sourcing problem: The acyclic case (Q1826488) (← links)
- Mathematical modelling of the order-promising process for fruit supply chains considering the perishability and subtypes of products (Q2293973) (← links)
- A complementarity model for a supply chain network equilibrium problem with electronic commerce (Q2698590) (← links)
- (Q3581654) (← links)
- Near Myopic Heuristics for the Fixed-Life Perishability Problem (Q4282288) (← links)
- An asymptotically optimal greedy heuristic for the multiperiod single-sourcing problem: The cyclic case (Q4456074) (← links)