Pages that link to "Item:Q2905735"
From MaRDI portal
The following pages link to A Double Multivariate Exponentially Weighted Moving Average (dMEWMA) Control Chart for a Process Location Monitoring (Q2905735):
Displaying 15 items.
- A double-integral equation for the average run length of a multivariate exponentially weighted moving average control chart (Q1903186) (← links)
- Bayesian sequential update for monitoring and control of high-dimensional processes (Q2095228) (← links)
- Enhanced adaptive multivariate EWMA and CUSUM charts for process mean (Q3389625) (← links)
- Monitoring multivariate simple linear profiles using individual observations (Q3390359) (← links)
- A Multivariate Adaptive Exponentially Weighted Moving Average Control Chart (Q3562434) (← links)
- One‐sided mewama control charts (Q4266851) (← links)
- Double moving average–EWMA control chart for exponentially distributed quality (Q4607389) (← links)
- MEWMA charts when parameters are estimated with applications in gene expression and bimetal thermostat monitoring (Q5033963) (← links)
- One-sided and two one-sided MEWMA charts for monitoring process mean (Q5107734) (← links)
- Multivariate control chart based on the highest possibility region (Q5129064) (← links)
- Multivariate Control Chart Based on Multivariate Smirnov Test (Q5265815) (← links)
- A Distribution-free Multivariate Change-point Model for Statistical Process Control (Q5265818) (← links)
- Economically Optimal Design of a Multivariate Synthetic<i>T</i><sup>2</sup>Chart (Q5418876) (← links)
- A double generally weighted moving average control chart for monitoring the process variability (Q6109774) (← links)
- MEWMA based control charts with runs rules for monitoring multivariate simple linear regression profiles in Phase II (Q6558490) (← links)