Pages that link to "Item:Q3006906"
From MaRDI portal
The following pages link to AN OPTIMIZATION MODEL FOR PRECAST PROJECT PLANNING USING GROUP CONCEPTS (Q3006906):
Displaying 3 items.
- Establishing outsourcing and supply chain plans for prefabricated construction projects under uncertain productivity (Q1691707) (← links)
- Heterogeneous prestressed precast beams multiperiod production planning problem: modeling and solution methods (Q1979194) (← links)
- Deployment method of prefabricated component transport vehicle (Q2100444) (← links)