Pages that link to "Item:Q3035126"
From MaRDI portal
The following pages link to An approximate solution of the flow-shop problem with sequence dependent setup times (Q3035126):
Displaying 7 items.
- Decomposition methods for reentrant flow shops with sequence-dependent setup times (Q1579123) (← links)
- Modeling and solving the flow-shop scheduling problem with sequence-dependent setup times by firefly algorithm (case study: automotive industry) (Q2676023) (← links)
- (Q3321816) (← links)
- The flow shop problem with time lags and separated setup times (Q3734157) (← links)
- A MILP model for the<i>n</i>-job,<i>M</i>-stage flowshop with sequence dependent set-up times (Q3743087) (← links)
- (Q5449457) (← links)
- Flowshop with additional resources during setups: mathematical models and a GRASP algorithm (Q6109559) (← links)