Pages that link to "Item:Q3037112"
From MaRDI portal
The following pages link to OPTIMAL SCHEDULE IN A GT-TYPE FLOW-SHOP UNDER SERIES-PARALLEL PRECEDENCE CONSTRAINTS (Q3037112):
Displaying 7 items.
- Johnson's rule, composite jobs and the relocation problem (Q1011248) (← links)
- Two-machine flowshop group scheduling problem (Q1577379) (← links)
- A comprehensive review of flowshop group scheduling literature (Q1651625) (← links)
- A decomposition theory based on a dominance relation and composite jobs (Q1820683) (← links)
- A sequencing problem with family setup times (Q1917311) (← links)
- Multi-family scheduling in a two-machine reentrant flow shop with setups (Q2467261) (← links)
- A heuristic approach for two-machine no-wait flowshop scheduling with due dates and class setups (Q2496029) (← links)