Pages that link to "Item:Q3055268"
From MaRDI portal
The following pages link to Scheduling job shop problems with sequence-dependent setup times (Q3055268):
Displaying 17 items.
- Multi-stage stochastic mean-semivariance-CVaR portfolio optimization under transaction costs (Q299658) (← links)
- The third comprehensive survey on scheduling problems with setup times/costs (Q319774) (← links)
- A contribution and new heuristics for open shop scheduling (Q733548) (← links)
- Schedule generation schemes for the jop-shop problem with sequence-dependent setup times: dominance properties and computational analysis (Q817121) (← links)
- A knowledge-based approach for multi-factory production systems (Q1652022) (← links)
- Solving the serial batching problem in job shop manufacturing systems (Q1926815) (← links)
- Optimal crashing of an activity network with disruptions (Q2149579) (← links)
- Corrigendum to: ``Solving the flexible job shop scheduling problem with sequence-dependent setup times'' (Q2242323) (← links)
- Metaheuristic algorithm for solving biobjective possibility planning model of location-allocation in disaster relief logistics (Q2336252) (← links)
- Using a family of critical ratio-based approaches to minimize the number of tardy jobs in the job shop with sequence dependent setup times (Q2378452) (← links)
- Job Shop Scheduling with Setup Times and Maximal Time-Lags: A Simple Constraint Programming Approach (Q3569929) (← links)
- A MILP model for the<i>n</i>-job,<i>M</i>-stage flowshop with sequence dependent set-up times (Q3743087) (← links)
- (Q4247060) (← links)
- Stochastic sequencing with job families, set-up times, and due dates (Q4546853) (← links)
- Scheduling in dynamic assembly job-shops with jobs having different holding and tardiness costs (Q4655459) (← links)
- Algorithms for the wafer probing scheduling problem with sequence-dependent set-up time and due date restrictions (Q4681718) (← links)
- (Q5206679) (← links)