The following pages link to (Q3070887):
Displaying 5 items.
- Heuristic approaches to discrete-continuous project scheduling problems to minimize the makespan (Q535306) (← links)
- A hybrid exact method for a scheduling problem with a continuous resource and energy constraints (Q890001) (← links)
- Tabu search for discrete-continuous scheduling problems with heuristic continuous resource allocation (Q954934) (← links)
- Heuristics for scheduling with inventory: Dynamic focus via constraint criticality (Q1347601) (← links)
- Discrete-continuous project scheduling with discounted cash flows - a tabu search approach (Q2468474) (← links)