The following pages link to (Q3072315):
Displaying 3 items.
- The rescheduling problem on minimizing the total lateness with time disruption and deteriorating jobs (Q2927213) (← links)
- Scheduling Unit Jobs with a Common Deadline to Minimize the Sum of Weighted Completion Times and Rejection Penalties (Q2942667) (← links)
- Scheduling start time dependent jobs to minimize the total weighted completion time (Q4656674) (← links)