Pages that link to "Item:Q3114684"
From MaRDI portal
The following pages link to Sequencing JIT Mixed-Model Assembly Lines Under Station-Load and Part-Usage Constraints (Q3114684):
Displaying 31 items.
- Scheduling a single vehicle in the just-in-time part supply for a mixed-model assembly line (Q336585) (← links)
- A decomposition approach for the car resequencing problem with selectivity banks (Q339550) (← links)
- Balancing and scheduling of flexible mixed model assembly lines (Q481715) (← links)
- Level scheduling under limited resequencing flexibility (Q539476) (← links)
- Optimization framework for process scheduling of operation-dependent automobile assembly lines (Q691498) (← links)
- On the complexity of the car sequencing problem. (Q703239) (← links)
- Comments on ``solving real car sequencing problems with ant colony optimization'' [\textit{C. Gagné} et al., Eur. J. Oper. Res. 174, No. 3, 1427--1448 (2006: Zbl 1103.90409)] (Q879324) (← links)
- Algorithms for the car sequencing and the level scheduling problem (Q880539) (← links)
- The car sequencing problem: overview of state-of-the-art methods and industrial case-study of the ROADEF'2005 challenge problem (Q932211) (← links)
- Solving the car sequencing problem via branch \& bound (Q932220) (← links)
- Level scheduling for batched JIT supply (Q973058) (← links)
- Analysis and design of sequencing rules for car sequencing (Q976493) (← links)
- Sequencing mixed-model assembly lines to minimize part inventory cost (Q991825) (← links)
- Sequencing mixed-model assembly lines: survey, classification and model critique (Q1011163) (← links)
- The product rate variation problem and its relevance in real world mixed-model assembly lines (Q1015006) (← links)
- A transformed two-stage method for reducing the part-usage variation and a comparison of the product-level and part-level solutions in sequencing mixed-model assembly lines (Q1590816) (← links)
- A Lagrangian relaxation approach to the mixed-product assembly line sequencing problem: a case study of a door-lock company in Taiwan (Q1632965) (← links)
- Advanced constraint propagation for the combined car sequencing and level scheduling problem (Q1782169) (← links)
- Robust car sequencing for automotive assembly (Q2030663) (← links)
- Solving real car sequencing problems with ant colony optimization (Q2503217) (← links)
- Car sequencing versus mixed-model sequencing: a computational study (Q2514809) (← links)
- Controlling mixed-model assembly lines in real-time by using distributed systems (Q2569076) (← links)
- An adaptive genetic algorithm approach for the mixed-model assembly line sequencing problem (Q3163205) (← links)
- A heuristic procedure for the automobile assembly-line sequencing problem considering multiple product options (Q3541179) (← links)
- A comparative study of performance measures for throughput of a mixed model assembly line in a JIT environment (Q4245677) (← links)
- (Q4367282) (← links)
- Level schedules for mixed-model JIT production lines: characteristics of the largest instances that can be solved optimally (Q5385396) (← links)
- Production smoothing in just-in-time manufacturing systems: a review of the models and solution approaches (Q5385397) (← links)
- Sequence-to-customer goal with stochastic demands for a mixed-model assembly line (Q5438620) (← links)
- Mixed-model assembly line sequencing using beam search (Q5444567) (← links)
- Genetic Algorithm with Hybrid Integer Linear Programming Crossover Operators for the Car-Sequencing Problem (Q6160231) (← links)