Pages that link to "Item:Q3114719"
From MaRDI portal
The following pages link to On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints (Q3114719):
Displaying 37 items.
- An exact algorithm for an integrated project staffing problem with a homogeneous workforce (Q282236) (← links)
- Dismantling of nuclear power plants at optimal NPV (Q646667) (← links)
- The discrete time/cost trade-off problem: Extensions and heuristic procedures (Q835571) (← links)
- Knowledge integration using problem spaces: A study in resource-constrained project scheduling (Q880537) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- Simulated annealing and tabu search for multi-mode project payment scheduling (Q1042041) (← links)
- An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations (Q1265850) (← links)
- Project network models with discounted cash flows a guided tour through recent developments (Q1278075) (← links)
- Project selection with discounted returns and multiple constraints (Q1278274) (← links)
- A flexible heuristic for a multi-mode capital constrained project scheduling problem with probabilistic cash inflows (Q1373161) (← links)
- An agency perspective for multi-mode project scheduling with time/cost trade-offs (Q1722976) (← links)
- Capital- and resource-constrained project scheduling with net present value optimization (Q1752257) (← links)
- Generic negotiation mechanisms with side payments -- design, analysis and application for decentralized resource-constrained multi-project scheduling problems (Q1753651) (← links)
- Moments and distribution of the net present value of a serial project (Q1754257) (← links)
- Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models (Q1767683) (← links)
- Progress payments in project scheduling problems. (Q1812008) (← links)
- A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing (Q2027048) (← links)
- Considering project management activities for engineering design groups (Q2226486) (← links)
- The bilevel optimisation of a multi-agent project scheduling and staffing problem (Q2239938) (← links)
- Multi-mode project payment scheduling problems with bonus-penalty structure (Q2482794) (← links)
- CP methods for scheduling and routing with~time-dependent task costs (Q2513747) (← links)
- Project selection, scheduling and resource allocation with time dependent returns (Q2519075) (← links)
- An analysis of network and resource indicators for resource-constrained project scheduling problem instances (Q2668709) (← links)
- A two-phase algorithm for a resource constrained project scheduling problem with discounted cash flows (Q2825622) (← links)
- A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows (Q3163363) (← links)
- Client‐contractor bargaining on net present value in project scheduling with limited resources (Q3621917) (← links)
- A Branch and Bound Procedure for the Resource Constrained Project Scheduling Problem with Discounted Cash Flows (Q4363602) (← links)
- Performance of the heuristic procedures for constrained projects with progress payments (Q4366460) (← links)
- Heuristic scheduling of resource-constrained projects with cash flows (Q4367294) (← links)
- A bidirectional heuristic for maximizing the net present value of large-scale projects subject to limited resources (Q4456063) (← links)
- Optimization Strategies for Resource-Constrained Project Scheduling Problems in Underground Mining (Q5060783) (← links)
- Maximizing the net present value of a project under resource constraints using a Lagrangian relaxation based heuristic with tight upper bounds (Q5948202) (← links)
- New resource-constrained project scheduling instances for testing (meta-)heuristic scheduling algorithms (Q6164372) (← links)
- An exact decomposition technique for the deadline-constrained discrete time/cost trade-off problem with discounted cash flows (Q6551096) (← links)
- Reducing the feasible solution space of resource-constrained project instances (Q6561212) (← links)
- A branch-and-bound algorithm for the proactive resource-constrained project scheduling problem with a robustness maximization objective (Q6568412) (← links)
- On the summary measures for the resource-constrained project scheduling problem (Q6581387) (← links)