Pages that link to "Item:Q3116657"
From MaRDI portal
The following pages link to Project Scheduling Under Partially Renewable Resource Constraints (Q3116657):
Displaying 32 items.
- Personnel scheduling and supplies provisioning in emergency relief operations (Q256662) (← links)
- Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting (Q337299) (← links)
- R\&D pipeline management: task interdependencies and risk management (Q420877) (← links)
- Project scheduling with flexible resources: formulation and inequalities (Q443821) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- Dismantling of nuclear power plants at optimal NPV (Q646667) (← links)
- A two-stage stochastic programming approach for project planning with uncertain activity durations (Q835555) (← links)
- Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting (Q859913) (← links)
- A branch and cut algorithm for resource-constrained project scheduling problem subject to nonrenewable resources with pre-scheduled procurement (Q900590) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- GreedEx---a scalable clearing mechanism for utility computing (Q1020573) (← links)
- Scheduling non-professional table-tennis leagues (Q1042487) (← links)
- Distribution requirements and compactness constraints in school timetabling (Q1291590) (← links)
- ProGen/\(\pi x\) -- An instance generator for resource-constrained project scheduling problems with partially renewable resources and further extensions (Q1578557) (← links)
- Branch and bound algorithms for resource constrained project scheduling problem subject to nonrenewable resources with prescheduled procurement (Q1718808) (← links)
- Resource-constrained project scheduling: Notation, classification, models, and methods (Q1806880) (← links)
- Packing chained items in aligned bins with applications to container transshipment and project scheduling (Q1935930) (← links)
- A partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints (Q2152012) (← links)
- A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints (Q2197158) (← links)
- Considering project management activities for engineering design groups (Q2226486) (← links)
- Modeling and solving a bi-objective airport slot scheduling problem (Q2301948) (← links)
- GRASP and path relinking for project scheduling under partially renewable resources (Q2482792) (← links)
- A scatter search algorithm for project scheduling under partially renewable resources (Q2491335) (← links)
- Project selection, scheduling and resource allocation with time dependent returns (Q2519075) (← links)
- Scheduling the professional soccer leagues of Austria and Germany (Q2583771) (← links)
- A project scheduling problem with periodically aggregated resource-constraints (Q2669745) (← links)
- Allocation of partially renewable resources: Concept, capabilities, and applications (Q2709887) (← links)
- Scheduling unit-time tasks in renewable resource constrained flowshops (Q4031376) (← links)
- Case-based reasoning and improved adaptive search for project scheduling (Q4487088) (← links)
- (Q4517279) (← links)
- A constructive branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints (Q6102850) (← links)
- Generation schemes for the resource-constrained project scheduling problem with partially renewable resources and generalized precedence constraints (Q6588473) (← links)