The following pages link to (Q3131278):
Displaying 6 items.
- Scheduling a single vehicle in the just-in-time part supply for a mixed-model assembly line (Q336585) (← links)
- Scheduling just-in-time part supply for mixed-model assembly lines (Q2275595) (← links)
- Material allocation in MRP with tardiness penalties (Q2564888) (← links)
- A kanban-based simulation study of a mixed model just-in-time manufacturing line (Q4398958) (← links)
- Integrated modeling of material delivery and container pickup problem for aircraft moving assembly line (Q5196967) (← links)
- Joint replenishment meets scheduling (Q6102849) (← links)