Pages that link to "Item:Q3154403"
From MaRDI portal
The following pages link to Multiple shift scheduling of workforce on four-day workweeks (Q3154403):
Displaying 8 items.
- An algorithm for single shift scheduling of hierarchical workforce (Q1278468) (← links)
- Efficient generation of rotating workforce schedules (Q1348256) (← links)
- Designing an annual leave scheduling policy: case of a financial center (Q2086959) (← links)
- Rota: A research project on algorithms for workforce scheduling and shift design optimization (Q2755399) (← links)
- A set-processing algorithm for scheduling staff on 4-day or 3-day work weeks (Q4248933) (← links)
- A Multiple-Shift Workforce Scheduling Model Under the 4-Day Workweek with Weekday and Weekend Labour Demands (Q4319494) (← links)
- A general multi-shift scheduling system (Q4681719) (← links)
- A 4-DAY OR A 3-DAY WORKWEEKS SCHEDULING PROBLEM WITH A GIVEN WORKFORCE SIZE (Q5850791) (← links)