Pages that link to "Item:Q3157306"
From MaRDI portal
The following pages link to Phase transitions in project scheduling (Q3157306):
Displaying 19 items.
- A genetic algorithm for the robust resource leveling problem (Q283265) (← links)
- An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem (Q296973) (← links)
- Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem (Q415556) (← links)
- The discrete time/cost trade-off problem: Extensions and heuristic procedures (Q835571) (← links)
- Resource-constrained project scheduling: A survey of recent developments. (Q1406618) (← links)
- A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs (Q1631504) (← links)
- Robust proactive project scheduling model for the stochastic discrete time/cost trade-off problem (Q1723411) (← links)
- New computational results for the discrete time/cost trade-off problem with time-switch constraints (Q1772840) (← links)
- Nash equilibrium solutions in multi-agent project scheduling with milestones (Q2031069) (← links)
- A reduction tree approach for the discrete time/cost trade-off problem (Q2147020) (← links)
- Price of anarchy and price of stability in multi-agent project scheduling (Q2288992) (← links)
- An evaluation of the adequacy of project network generators with systematically sampled networks (Q2463502) (← links)
- Going to the core of hard resource-constrained project scheduling instances (Q2664304) (← links)
- An analysis of network and resource indicators for resource-constrained project scheduling problem instances (Q2668709) (← links)
- The Travelling Salesman Problem for finite-sized cities (Q3061161) (← links)
- A Theoretical Framework for Instance Complexity of the Resource-Constrained Project Scheduling Problem (Q5870371) (← links)
- New resource-constrained project scheduling instances for testing (meta-)heuristic scheduling algorithms (Q6164372) (← links)
- Reducing the feasible solution space of resource-constrained project instances (Q6561212) (← links)
- On the summary measures for the resource-constrained project scheduling problem (Q6581387) (← links)