Pages that link to "Item:Q3163144"
From MaRDI portal
The following pages link to A branch and bound algorithm for optimal cyclic scheduling in a robotic cell with processing time windows (Q3163144):
Displaying 16 items.
- Robust optimization for the cyclic hoist scheduling problem (Q300031) (← links)
- Approximation algorithms for \(k\)-unit cyclic solutions in robotic cells (Q706905) (← links)
- An improved algorithm for cyclic flowshop scheduling in a robotic cell (Q1278650) (← links)
- Optimizing energy consumption of robotic cells by a branch \& bound algorithm (Q1628117) (← links)
- A dynamic scheduling approach for optimizing the material handling operations in a robotic cell (Q1654361) (← links)
- A branch-and-bound procedure for the robust cyclic job shop problem (Q1661891) (← links)
- Multi-machine scheduling with interval constrained position-dependent processing times (Q1716992) (← links)
- Nash-equilibrium algorithm and incentive protocol for a decentralized decision and scheduling problem in sustainable electroplating plants (Q2027040) (← links)
- Joint production and transportation scheduling in flexible manufacturing systems (Q2274861) (← links)
- A comparative study on three graph-based constructive algorithms for multi-stage scheduling with blocking (Q2423281) (← links)
- Cyclic flowshop scheduling with operators and robots: Vyacheslav Tanaev's vision and lasting contributions (Q2434294) (← links)
- Cyclic scheduling of a 2-machine robotic cell with tooling constraints (Q2503054) (← links)
- Algorithms for single-machine scheduling problem with deterioration depending on a novel model (Q2628177) (← links)
- Bicriteria robotic cell scheduling with controllable processing times (Q2997880) (← links)
- A dynamic scheduling algorithm for singe-arm two-cluster tools with flexible processing times (Q5058723) (← links)
- Bi-objective speed-scaling robotic cell scheduling with peak power consumption constraint (Q6133185) (← links)