The following pages link to (Q3170676):
Displaying 6 items.
- The inverse parallel machine scheduling problem with minimum total completion time (Q380601) (← links)
- An intelligent water drop algorithm to identical parallel machine scheduling with controllable processing times: a just-in-time approach (Q520264) (← links)
- Just-in-time scheduling with controllable processing times on parallel machines (Q975765) (← links)
- Two parallel machine sequencing problems involving controllable job processing times (Q1310019) (← links)
- A dominant class of schedules for malleable jobs in the problem to minimize the total weighted completion time (Q1762110) (← links)
- Approximation schemes for parallel machine scheduling problems with controllable processing times (Q1885962) (← links)