Pages that link to "Item:Q319449"
From MaRDI portal
The following pages link to A continuous time-cost tradeoff problem with multiple milestones and completely ordered jobs (Q319449):
Displaying 7 items.
- Complexity results for the linear time-cost tradeoff problem with multiple milestones and completely ordered jobs (Q299837) (← links)
- Simplifying the nonlinear continuous time-cost tradeoff problem (Q1697748) (← links)
- Scheduling two projects with controllable processing times in a single-machine environment (Q2215194) (← links)
- Considering project management activities for engineering design groups (Q2226486) (← links)
- A linear time-cost tradeoff problem with multiple milestones under a comb graph (Q2424814) (← links)
- A Time–Cost Tradeoff Problem with Multiple Assessments and Release Times on a Chain Precedence Graph (Q5024918) (← links)
- Single-machine scheduling of multiple projects with controllable processing times (Q6167669) (← links)