The following pages link to José Fernando Gonçalves (Q319724):
Displaying 24 items.
- A biased random-key genetic algorithm for the unequal area facility layout problem (Q319725) (← links)
- A multi-population hybrid biased random key genetic algorithm for hop-constrained trees in nonlinear cost flow networks (Q360513) (← links)
- A biased random-key genetic algorithm for the Steiner triple covering problem (Q691474) (← links)
- (Q947945) (redirect page) (← links)
- A random key based genetic algorithm for the resource constrained project scheduling problem (Q947946) (← links)
- A genetic algorithm approach for the single machine scheduling problem with linear earliness and quadratic tardiness penalties (Q1017438) (← links)
- (Q1303541) (redirect page) (← links)
- A hybrid heuristic and linear programming approach to multi-product machine scheduling (Q1303542) (← links)
- A parallel multi-population biased random-key genetic algorithm for a container loading problem (Q1761962) (← links)
- The multi-parent biased random-key genetic algorithm with implicit path-relinking and its real-world applications (Q2028795) (← links)
- A MIP model and a biased random-key genetic algorithm based approach for a two-dimensional cutting problem with defects (Q2189880) (← links)
- Modeling supply chain network: a need to incorporate financial considerations (Q2325232) (← links)
- An edge-swap heuristic for generating spanning trees with minimum number of branch vertices (Q2448195) (← links)
- A genetic algorithm for the resource constrained multi-project scheduling problem (Q2482793) (← links)
- A hybrid genetic algorithm for the job shop scheduling problem (Q2484343) (← links)
- A hybrid genetic algorithm-heuristic for a two-dimensional orthogonal packing problem (Q2643953) (← links)
- A biased random-key genetic algorithm for the minimization of open stacks problem (Q2803254) (← links)
- Heuristic solutions for general concave minimum cost network flow problems (Q3593371) (← links)
- A Heuristic Scheduling Policy for Multi-Item, Multi-Machine Production Systems with Time-Varying, Stochastic Demands (Q4834355) (← links)
- A Genetic Algorithm for Scheduling Alternative Tasks Subject to Technical Failure (Q5270510) (← links)
- An extended Akers graphical method with a biased random‐key genetic algorithm for job‐shop scheduling (Q5416771) (← links)
- A HYBRID GENETIC ALGORITHM FOR THE EARLY/TARDY SCHEDULING PROBLEM (Q5487850) (← links)
- A multistart biased random key genetic algorithm for the flexible job shop scheduling problem with transportation (Q6079857) (← links)
- A hybrid particle swarm optimization and simulated annealing algorithm for the job shop scheduling problem with transport resources (Q6106766) (← links)