The following pages link to Faicel Hnaien (Q319834):
Displaying 9 items.
- A multi-step rolled forward chance-constrained model and a proactive dynamic approach for the wheat crop quality control problem (Q319836) (← links)
- Sensor deployment optimization methods to achieve both coverage and connectivity in wireless sensor networks (Q337522) (← links)
- Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times (Q975990) (← links)
- Exact method to optimize the total electricity cost in two-machine permutation flow shop scheduling problem under time-of-use tariff (Q2147073) (← links)
- (Q3181485) (← links)
- Optimal supply planning in MRP environments for assembly systems with random component procurement times (Q3541192) (← links)
- The Joint Load Balancing and Parallel Machine Scheduling Problem (Q5232864) (← links)
- (Q5411857) (← links)
- Minimizing the makespan for the two-machine flow shop scheduling problem with random breakdown (Q6179225) (← links)