Pages that link to "Item:Q323449"
From MaRDI portal
The following pages link to Optimal berth allocation, time-variant quay crane assignment and scheduling with crane setups in container terminals (Q323449):
Displaying 38 items.
- A follow-up survey of berth allocation and quay crane scheduling problems in container terminals (Q319438) (← links)
- Scheduling cranes at an indented berth (Q323166) (← links)
- A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time (Q613450) (← links)
- Multi-objective and prioritized berth allocation in container ports (Q613765) (← links)
- Online integrated allocation of berths and quay cranes in container terminals with 1-lookahead (Q721944) (← links)
- A survey of berth allocation and quay crane scheduling problems in container terminals (Q1040981) (← links)
- MIP approaches for the integrated berth allocation and quay crane assignment and scheduling problem (Q1694325) (← links)
- New exact methods for the time-invariant berth allocation and quay crane assignment problem (Q1711448) (← links)
- Robust scheduling for berth allocation and quay crane assignment problem (Q1719234) (← links)
- Integrated berth allocation and time-variant quay crane scheduling with tidal impact in approach channel (Q1727298) (← links)
- An evolutionary approach to a combined mixed integer programming model of seaside operations as arise in container ports (Q1730615) (← links)
- The quay crane scheduling problem with non-crossing and safety clearance constraints: an exact solution approach (Q1738835) (← links)
- Approximate the scheduling of quay cranes with non-crossing constraints (Q1751714) (← links)
- A scheduling method for Berth and Quay cranes (Q1871763) (← links)
- The berth allocation problem in terminals with irregular layouts (Q1991240) (← links)
- Integrated laycan and berth allocation and time-invariant quay crane assignment problem in tidal ports with multiple quays (Q2030331) (← links)
- Compact ILP formulations for a class of solutions to berth allocation and quay crane scheduling problems (Q2150520) (← links)
- A robust multiobjective model for the integrated berth and quay crane scheduling problem at seaside container terminals (Q2163853) (← links)
- An exact robust approach for the integrated berth allocation and quay crane scheduling problem under uncertain arrival times (Q2239892) (← links)
- Optimal berth allocation and time-invariant quay crane assignment in container terminals (Q2256246) (← links)
- Assignment problem with conflicts (Q2273673) (← links)
- Straddle carrier routing at seaport container terminals in the presence of short term quay crane buffer areas (Q2315629) (← links)
- A Lagrangian relaxation approach for solving the integrated quay crane assignment and scheduling problem (Q2337546) (← links)
- A joint quay crane assignment and scheduling problem: formulation, solution algorithm and computational results (Q2341106) (← links)
- Minimum cost noncrossing flow problem on layered networks (Q2414449) (← links)
- A queuing network model for the management of berth crane operations (Q2471220) (← links)
- Optimizing the landside operation of a container terminal (Q2480802) (← links)
- Exact and heuristic methods for the integrated berth allocation and specific time-invariant quay crane assignment problems (Q2669757) (← links)
- Integrated proactive-reactive approach and a hybrid adaptive large neighborhood search algorithm for berth and quay crane scheduling under uncertain combination (Q2691472) (← links)
- Online Integrated Allocation of Berths and Quay Cranes in Container Terminals with 1-Lookahead (Q3196402) (← links)
- Berth scheduling for container terminals by using a sub-gradient optimization technique (Q4656722) (← links)
- Simultaneous Optimization of Berth Allocation, Quay Crane Assignment and Quay Crane Scheduling Problems in Container Terminals (Q5171782) (← links)
- A study of online berth and quay crane integrated allocation problem with lookahead ability (Q5197271) (← links)
- Minimum cost flow problem with conflicts (Q6065835) (← links)
- Carbon-efficient scheduling problem of electric rubber-tyred gantry cranes in a container terminal (Q6094578) (← links)
- Simultaneous operation of next-generation and traditional quay cranes at container terminals (Q6112695) (← links)
- The synergistic effect of operational research and big data analytics in greening container terminal operations: a review and future directions (Q6113444) (← links)
- The berth allocation and quay crane assignment problem with crane travel and setup times (Q6551060) (← links)