The following pages link to Simranjit Kaur (Q326487):
Displaying 3 items.
- Scheduling arc shut downs in a network to maximize flow over time with a bounded number of jobs per time period (Q326488) (← links)
- Scheduling network maintenance jobs with release dates and deadlines to maximize total flow over time: bounds and solution strategies (Q342075) (← links)
- Scheduling unit time arc shutdowns to maximize network flow over time: Complexity results (Q4639695) (← links)