Pages that link to "Item:Q331769"
From MaRDI portal
The following pages link to Coping with production time variability via dynamic lead-time quotation (Q331769):
Displaying 7 items.
- Optimal and heuristic lead-time quotation for an integrated steel mill with a minimum batch size (Q541698) (← links)
- The impact of production time variability on make-to-stock queue performance (Q958575) (← links)
- Optimization and customer utilities under dynamic lead time quotation in an \(M / M\) type base stock system (Q1992895) (← links)
- Single versus dynamic lead-time quotations in make-to-order systems with delay-averse customers (Q2095901) (← links)
- Dynamic lead time quotation under responsive inventory and multiple customer classes (Q2362239) (← links)
- Fair and profitable: how pricing and lead-time quotation policies can help (Q2670532) (← links)
- Dynamic Lead-Time Quotation for an M/M/1 Base-Stock Inventory Queue (Q3100475) (← links)