Pages that link to "Item:Q339677"
From MaRDI portal
The following pages link to A note on ``Two-machine flow-shop scheduling with rejection'' and its link with flow-shop scheduling and common due date assignment (Q339677):
Displaying 4 items.
- A note: minmax due-date assignment problem with lead-time cost (Q336460) (← links)
- A constraint generation approach for two-machine shop problems with jobs selection (Q1751902) (← links)
- Due-date assignment for multi-server multi-stage assembly systems (Q5252913) (← links)
- TWO-MACHINE FLOW SHOP SCHEDULING WITH INDIVIDUAL OPERATION'S REJECTION (Q5411726) (← links)