The following pages link to (Q3426432):
Displaying 8 items.
- A flow-based tabu search algorithm for the RCPSP with transfer times (Q280159) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- On the use of genetic programming to evolve priority rules for resource constrained project scheduling problems (Q781900) (← links)
- A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times (Q1014947) (← links)
- A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing (Q2027048) (← links)
- A local search framework for industrial test laboratory scheduling (Q2241157) (← links)
- Managing and modelling general resource transfers in (multi-)project scheduling (Q2379662) (← links)
- Local search approaches for the test laboratory scheduling problem with variable task grouping (Q6090219) (← links)