Pages that link to "Item:Q3428916"
From MaRDI portal
The following pages link to The stochastic time–cost tradeoff problem: A robust optimization approach (Q3428916):
Displaying 21 items.
- An adaptive crashing policy for stochastic time-cost tradeoff problems (Q342024) (← links)
- Robust resource allocations in temporal networks (Q715076) (← links)
- Optimization models and a GA-based algorithm for stochastic time-cost trade-off problem (Q732489) (← links)
- Maximizing the net present value of a project under uncertainty (Q1039778) (← links)
- A hybrid simulation-optimization approach for the robust discrete time/cost trade-off problem (Q1636886) (← links)
- Robust proactive project scheduling model for the stochastic discrete time/cost trade-off problem (Q1723411) (← links)
- Conditions under which adjustability lowers the cost of a robust linear program (Q1730447) (← links)
- A survey of adjustable robust optimization (Q1740490) (← links)
- Multi-resource allocation in stochastic project scheduling (Q1931636) (← links)
- A robust optimization approach for the multi-mode resource-constrained project scheduling problem (Q2030698) (← links)
- Due-date quotation model for manufacturing system scheduling under uncertainty (Q2058567) (← links)
- A robust time-cost-quality-energy-environment trade-off with resource-constrained in project management: a case study for a bridge construction project (Q2076443) (← links)
- Dynamic planning of a two-dose vaccination campaign with uncertain supplies (Q2079443) (← links)
- Managing risk-adjusted resource allocation for project time-cost tradeoffs (Q2095230) (← links)
- An adaptive robust optimization model for parallel machine scheduling (Q2106719) (← links)
- Optimal crashing of an activity network with disruptions (Q2149579) (← links)
- A stochastic multimode model for time-cost tradeoffs under management flexibility (Q2460073) (← links)
- Expectation and Chance-Constrained Models and Algorithms for Insuring Critical Paths (Q3117319) (← links)
- Min-Max Regret Version of the Linear Time–Cost Tradeoff Problem with Multiple Milestones and Completely Ordered Jobs (Q3455883) (← links)
- Estimation of average time profit for stochastic structured population (Q4986796) (← links)
- Robust Capacity Planning for Project Management (Q5084614) (← links)