The following pages link to (Q3436602):
Displaying 3 items.
- A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times (Q879286) (← links)
- The three-machine flowshop scheduling problem to minimise maximum lateness with separate setup times (Q1000165) (← links)
- A survey of scheduling problems with setup times or costs (Q2467249) (← links)