Pages that link to "Item:Q3530956"
From MaRDI portal
The following pages link to Integrated Scheduling of Production and Distribution Operations (Q3530956):
Displaying 50 items.
- Integrated production and distribution scheduling problems related with fixed delivery departure dates and number of late orders (Q257796) (← links)
- Integrating release and dispatch policies in production models (Q258510) (← links)
- Approximation algorithms for the single-machine scheduling with a period of maintenance (Q279822) (← links)
- Online integrated production-distribution scheduling problems without preemption (Q281801) (← links)
- Coordination of production and interstage batch delivery with outsourced distribution (Q296709) (← links)
- On-line supply chain scheduling for single-machine and parallel-machine configurations with a single customer: minimizing the makespan and delivery cost (Q319441) (← links)
- Optimization of cost and service level in the presence of supply chain disruption risks: single vs. multiple sourcing (Q337101) (← links)
- Heuristics for parallel machine scheduling with batch delivery consideration (Q380563) (← links)
- A heuristic approach to a single stage assembly problem with transportation allocation (Q387489) (← links)
- Coordinated scheduling of production and delivery with production window and delivery capacity constraints (Q417989) (← links)
- Integrated scheduling of production and delivery on a single machine with availability constraint (Q476906) (← links)
- Supply chain scheduling to minimize holding costs with outsourcing (Q490179) (← links)
- Cost-based decision-making in middleware virtualization environments (Q531466) (← links)
- Using genetic algorithms for the coordinated scheduling problem of a batching machine and two-stage transportation (Q555434) (← links)
- An improved approximation algorithm for single machine scheduling with job delivery (Q621846) (← links)
- Machine scheduling with deliveries to multiple customer locations (Q707086) (← links)
- Impact of merging activities in a supply chain under the guaranteed service model: centralized and decentralized cases (Q823464) (← links)
- Minmizing service span with batch-position-based learning effects (Q828675) (← links)
- A hybrid two-stage transportation and batch scheduling problem (Q838180) (← links)
- On-line supply chain scheduling problems with preemption (Q872299) (← links)
- On the machine scheduling problem with job delivery coordination (Q884029) (← links)
- The scheduling of deliveries in a production-distribution system with multiple buyers (Q940913) (← links)
- Supply chain scheduling: Just-in-time environment (Q940916) (← links)
- Production scheduling with supply and delivery considerations to minimize the makespan (Q958556) (← links)
- The coordination of transportation and batching scheduling (Q965544) (← links)
- Integrated production and distribution scheduling with committed delivery dates (Q969521) (← links)
- Robust supply chain design under uncertain demand in agile manufacturing (Q1040967) (← links)
- On-line integrated production-distribution scheduling problems with capacitated deliveries (Q1042489) (← links)
- Optimizing production and transportation in a commit-to-delivery business mode (Q1046062) (← links)
- Integration of the human operator into responsive discrete production management systems (Q1296664) (← links)
- Multiproduct integrated production-distribution systems (Q1330546) (← links)
- Integrated production and outbound distribution scheduling problems with job release dates and deadlines (Q1617275) (← links)
- Smart scheduling: an integrated first mile and last mile supply approach (Q1654305) (← links)
- Parallel machine scheduling with batch delivery to two customers (Q1665075) (← links)
- Integrated production-distribution scheduling problem with multiple independent manufacturers (Q1666043) (← links)
- Integrated scheduling on a batch machine to minimize production, inventory and distribution costs (Q1698887) (← links)
- Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence (Q1702665) (← links)
- Two-agent supply chain scheduling problem to minimize the sum of the total weighted completion time and batch cost (Q1706684) (← links)
- Batch delivery scheduling with multiple decentralized manufacturers (Q1718128) (← links)
- An uncertain programming for the integrated planning of production and transportation (Q1718332) (← links)
- An integrated model for production and distribution planning of perishable products with inventory and routing considerations (Q1718473) (← links)
- Scheduling and common due date assignment on a single parallel-batching machine with batch delivery (Q1723354) (← links)
- Online scheduling on a single machine with grouped processing times (Q1723520) (← links)
- Integrated optimization of material supplying, manufacturing, and product distribution: models and fast algorithms (Q1735170) (← links)
- Comparing sequential and integrated approaches for the production routing problem (Q1750476) (← links)
- Optimization model for a production, inventory, distribution and routing problem in small furniture companies (Q1752350) (← links)
- Coordination in a two-stage production system: complexity, conflict and cooperation (Q1762107) (← links)
- Integrated scheduling of production and distribution with release dates and capacitated deliveries (Q1793780) (← links)
- Integrated scheduling of production and distribution for manufacturers with parallel batching facilities (Q1800447) (← links)
- Feature issue: Integrated production/ distribution planning in supply chains (Q1809795) (← links)