The following pages link to GEOVIA Whittle (Q35663):
Displaying 3 items.
- A study of the Bienstock-Zuckerberg algorithm: applications in mining and resource constrained project scheduling (Q1744895) (← links)
- Practical performance of an open pit mine scheduling model considering blending and stockpiling (Q2289890) (← links)
- Production Scheduling for Strategic Open Pit Mine Planning: A Mixed-Integer Programming Approach (Q5144773) (← links)