Pages that link to "Item:Q3758548"
From MaRDI portal
The following pages link to Some Optimum Algorithms for Scheduling Problems with Changeover Costs (Q3758548):
Displaying 10 items.
- Optimal single machine scheduling of products with components and changeover cost (Q297186) (← links)
- Scheduling with few changes (Q299829) (← links)
- KBSS: A knowledge-based system for scheduling in automated manufacturing (Q583088) (← links)
- A forward branch-and-search algorithm and forecast horizon results for the changeover scheduling problem (Q1278236) (← links)
- A Lagrangean decomposition solution to a single line multiproduct scheduling problem (Q1342036) (← links)
- A polynomial algorithm for lot-size scheduling of two type tasks. (Q1853075) (← links)
- Lot-size scheduling of two types of jobs on identical machines (Q1917283) (← links)
- The changeover scheduling problem with time and cost considerations: Analytical results and a forward algorithm (Q2770123) (← links)
- Impact of sequence-dependent setup time on job shop scheduling performance (Q4394289) (← links)
- Modeling industrial lot sizing problems: a review (Q5385468) (← links)