Pages that link to "Item:Q3815117"
From MaRDI portal
The following pages link to The Single Machine Problem with a Quadratic Cost Function of Completion Times (Q3815117):
Displaying 9 items.
- Single machine quadratic penalty function scheduling with deteriorating jobs and group technology (Q611621) (← links)
- Parametric precedence relations in single machine scheduling (Q916560) (← links)
- A scheduling problem with job values given as a power function of their completion times (Q954933) (← links)
- Solution of the generalized Townsend single machine scheduling model (Q1278202) (← links)
- Minimizing the weighted sum of squared tardiness on a single machine (Q1762060) (← links)
- Minimizing non-decreasing separable objective functions for the unit-time open shop scheduling problem (Q1772847) (← links)
- Minimizing the sum of squares lateness on a single machine (Q1848630) (← links)
- The weighted common due date single machine scheduling problem revisited (Q1919202) (← links)
- Numerical Methods for Single Machine Scheduling with Non-linear Cost Functions to Minimize Total Cost (Q5289668) (← links)