Pages that link to "Item:Q398901"
From MaRDI portal
The following pages link to Scheduling modular projects on a bottleneck resource (Q398901):
Displaying 17 items.
- Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project (Q322744) (← links)
- An exact method for scheduling of the alternative technologies in R\&D projects (Q339595) (← links)
- Scheduling of design projects with uncertain number of iterations (Q1124816) (← links)
- Maximizing the expected net present value of a project with phase-type distributed activity durations: an efficient globally optimal solution procedure (Q1754200) (← links)
- Moments and distribution of the net present value of a serial project (Q1754257) (← links)
- Sequential testing of \(n\)-out-of-\(n\) systems: precedence theorems and exact methods (Q1755382) (← links)
- Maximum probabilistic all-or-nothing paths (Q2286936) (← links)
- Stochastic project scheduling with hierarchical alternatives (Q2295321) (← links)
- On the complexity of project scheduling to minimize exposed time (Q2514874) (← links)
- Project planning with alternative technologies in uncertain environments (Q2630099) (← links)
- A RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM WITH REATTEMPT AT FAILURE : A HEURISTIC APPROACH (Q4367070) (← links)
- Scheduling tasks with failure probabilities to minimize expected cost (Q4735026) (← links)
- A branch‐and‐bound algorithm for scheduling of new product development projects (Q4921224) (← links)
- State-Variable Modeling for a Class of Two-Stage Stochastic Optimization Problems (Q5084656) (← links)
- A Genetic Algorithm for Scheduling Alternative Tasks Subject to Technical Failure (Q5270510) (← links)
- Project scheduling under the threat of catastrophic disruption (Q6112627) (← links)
- A stochastic bi-objective project scheduling model under failure of activities (Q6588491) (← links)