Pages that link to "Item:Q398911"
From MaRDI portal
The following pages link to Minimizing total weighted completion time with an unexpected machine unavailable interval (Q398911):
Displaying 11 items.
- Semi-online scheduling on a single machine with unexpected breakdown (Q306274) (← links)
- Risk measure of job shop scheduling with random machine breakdowns (Q1654341) (← links)
- Minimizing the weighted sum of completion times under processing time uncertainty (Q1742192) (← links)
- Cost allocation in rescheduling with machine unavailable period (Q1754051) (← links)
- An improved semi-online algorithm for scheduling on a single machine with unexpected breakdown (Q2185825) (← links)
- A note on minimizing total weighted completion time with an unexpected machine unavailable interval (Q2281620) (← links)
- On the completion time and the interruption time of a job processed on an unreliable machine (Q2574491) (← links)
- Universal Sequencing on a Single Machine (Q3569821) (← links)
- Lift-and-Round to Improve Weighted Completion Time on Unrelated Machines (Q4997316) (← links)
- The LPT heuristic for minimizing total load on a proportionate openshop (Q6110607) (← links)
- Online single-processor scheduling with an unexpected breakdown (Q6561564) (← links)