The following pages link to (Q3991144):
Displaying 7 items.
- Fuzzy temporal characteristics of operations for project management on the network models basis (Q1869708) (← links)
- Method of fuzzy critical path for network planning and control over projects based on soft computations (Q1974324) (← links)
- (Q3224299) (← links)
- (Q3991143) (← links)
- (Q4281794) (← links)
- (Q4930542) (← links)
- (Q5861654) (← links)