Pages that link to "Item:Q402212"
From MaRDI portal
The following pages link to Production scheduling with uncertain supply: a new solution to the open pit mining problem (Q402212):
Displaying 31 items.
- Minimum cardinality non-anticipativity constraint sets for multistage stochastic programming (Q291043) (← links)
- Medium range optimization of copper extraction planning under uncertainty in future copper prices (Q297027) (← links)
- Optimizing mining complexes with multiple processing and transportation alternatives: an uncertainty-based approach (Q319952) (← links)
- Production phase and ultimate pit limit design under commodity price uncertainty (Q320746) (← links)
- Network-flow based algorithms for scheduling production in multi-processor open-pit mines accounting for metal uncertainty (Q322445) (← links)
- Progressive hedging applied as a metaheuristic to schedule production in open-pit mines accounting for reserve uncertainty (Q323260) (← links)
- Forecasting recoverable ore reserves and their uncertainty at Morila gold deposit, Mali: an efficient simulation approach and future grade control drilling (Q500787) (← links)
- The new Fundamental Tree Algorithm for production scheduling of open pit mines (Q856303) (← links)
- LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity (Q958440) (← links)
- A stochastic optimization formulation for the transition from open pit to underground mining (Q1642981) (← links)
- A dynamic-material-value-based decomposition method for optimizing a mineral value chain with uncertainty (Q1751684) (← links)
- Stochastic short-term mine production schedule accounting for fleet allocation, operational considerations and blending restrictions (Q1752139) (← links)
- Linear models for stockpiling in open-pit mine production scheduling problems (Q1753425) (← links)
- Optimizing a mineral value chain with market uncertainty using Benders decomposition (Q1755250) (← links)
- Underground mine scheduling under uncertainty (Q2031110) (← links)
- Uncertainty integration in dynamic mining reserves (Q2040718) (← links)
- A framework for adaptive open-pit mining planning under geological uncertainty (Q2138292) (← links)
- Solution procedures for block selection and sequencing in flat-bedded potash underground mines (Q2241902) (← links)
- A solution approach for optimizing long- and short-term production scheduling at LKAB's kiruna mine (Q2275613) (← links)
- Development of a scenario-based robust model for the optimal truck-shovel allocation in open-pit mining (Q2289886) (← links)
- Open pit mine planning with degradation due to stockpiling (Q2289888) (← links)
- Hyper-heuristic approaches for strategic mine planning under uncertainty (Q2289889) (← links)
- Practical performance of an open pit mine scheduling model considering blending and stockpiling (Q2289890) (← links)
- Production planning and scheduling in mining scenarios under IPCC mining systems (Q2289898) (← links)
- Stochastic optimization in mine planning scheduling (Q2289909) (← links)
- Constructing branching trees of geostatistical simulations (Q2676486) (← links)
- Production Scheduling for Strategic Open Pit Mine Planning: A Mixed-Integer Programming Approach (Q5144773) (← links)
- A simulated annealing approach to mine production scheduling (Q5313397) (← links)
- Learning to schedule heuristics for the simultaneous stochastic optimization of mining complexes (Q6047903) (← links)
- Short-term open-pit production scheduling optimizing multiple objectives accounting for shovel allocation in stockpiles (Q6159503) (← links)
- Optimization of open-pit mine design and production planning with an improved floating cone algorithm (Q6173792) (← links)