The following pages link to (Q4036582):
Displaying 5 items.
- An efficient parallel algorithm for scheduling interval ordered tasks (Q652455) (← links)
- Analysis of the list scheduling algorithm for precedence constrained parallel tasks (Q1304383) (← links)
- An NC algorithm for finding a minimum weighted completion time schedule on series parallel graphs (Q1924401) (← links)
- (Q4729335) (← links)
- Fast parallel heuristics for the job shop scheduling problem (Q5955476) (← links)