Pages that link to "Item:Q417989"
From MaRDI portal
The following pages link to Coordinated scheduling of production and delivery with production window and delivery capacity constraints (Q417989):
Displaying 13 items.
- Integrated production and distribution scheduling problems related with fixed delivery departure dates and number of late orders (Q257796) (← links)
- Scheduling identical parallel machines with fixed delivery dates to minimize total tardiness (Q319136) (← links)
- Reductions between scheduling problems with non-renewable resources and knapsack problems (Q482287) (← links)
- Capacitated dynamic lot-sizing problem with delivery/production time windows (Q613340) (← links)
- Coordinated production scheduling for make-to-order manufacturing (Q919989) (← links)
- Integrated production and delivery scheduling with disjoint windows (Q972326) (← links)
- Integrated production and outbound distribution scheduling problems with job release dates and deadlines (Q1617275) (← links)
- Two-echelon location routing synchronized with production schedules and time windows (Q1788921) (← links)
- Finding efficient make-to-order production and batch delivery schedules (Q2242200) (← links)
- An uncertain programming model for single machine scheduling problem with batch delivery (Q2313751) (← links)
- Supply chain scheduling in a collaborative manufacturing mode: model construction and algorithm design (Q2327696) (← links)
- Integrated production and distribution with fixed delivery departure dates (Q2450622) (← links)
- (Q3131282) (← links)