Pages that link to "Item:Q4230070"
From MaRDI portal
The following pages link to Incorporating maintenance activities into production planning; integration at the master schedule versus material requirements level (Q4230070):
Displaying 3 items.
- Integrating maintenance and production decisions in a hierarchical production planning environment (Q1304500) (← links)
- Production/maintenance cooperative scheduling using multi-agents and fuzzy logic (Q4706312) (← links)
- Condition-based Maintenance Policy for decentralised Production/Maintenance-Control (Q5176342) (← links)