Pages that link to "Item:Q4230165"
From MaRDI portal
The following pages link to A new method for workshop real time scheduling (Q4230165):
Displaying 10 items.
- Robustness in operational research and decision aiding: a multi-faceted issue (Q1044079) (← links)
- Flexible solutions in disjunctive scheduling: general formulation and study of the flow-shop case (Q1046704) (← links)
- RTSS: An interactive decision support system for solving real time scheduling problems considering customer and job priorities with schedule interruptions. (Q1406711) (← links)
- Using real time information for effective dynamic scheduling (Q1604065) (← links)
- Project scheduling under uncertainty: survey and research potentials (Q1772834) (← links)
- A study of scheduling problem in agro-food manufacturing systems (Q1849828) (← links)
- Executing production schedules in the face of uncertainties: a review and some future directions (Q1887777) (← links)
- Two-machine shop scheduling: Compromise between flexibility and makespan value (Q2566711) (← links)
- Dynamic surgery management under uncertainty (Q6112637) (← links)
- Two-stage stochastic/robust scheduling based on permutable operation groups (Q6596975) (← links)