Pages that link to "Item:Q4243198"
From MaRDI portal
The following pages link to Determining a threshold control policy for an imperfect production system with rework jobs (Q4243198):
Displaying 3 items.
- Optimizing a production system with rework and equal sized batch shipments (Q850297) (← links)
- Threshold control policy for maintainability of manufacturing system with unreliable workstations (Q1640507) (← links)
- Lot sizing in a production system with rework and product deterioration (Q5466721) (← links)