Pages that link to "Item:Q4252124"
From MaRDI portal
The following pages link to A comparison of sequencing rules in static and dynamic hybrid flow systems (Q4252124):
Displaying 5 items.
- A bottleneck-based heuristic for minimizing makespan in a flexible flow line with unrelated parallel machines (Q1025264) (← links)
- Minimizing makespan in a two-stage hybrid flow shop scheduling problem with open shop in one stage (Q2248262) (← links)
- The hybrid flow shop scheduling problem (Q2270289) (← links)
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective (Q2379653) (← links)
- Bottleneck-based heuristics to minimize tardy jobs in a flexible flow line with unrelated parallel machines (Q3605446) (← links)