The following pages link to The Repair Kit Problem Revisited (Q4286477):
Displaying 11 items.
- Multiple period repair kit problem with a job completion criterion: A case study (Q1129889) (← links)
- Inventory control of service parts in the final phase: A central depot and repair kits (Q1600888) (← links)
- The repair kit problem with positive replenishment lead times and fixed ordering costs (Q1753639) (← links)
- The repair kit problem with imperfect advance demand information (Q2171602) (← links)
- The multiple-job repair kit problem (Q2433467) (← links)
- Ordered optimal solutions and parametric minimum cut problems (Q2568331) (← links)
- Optimising a general repair kit problem with a service constraint (Q2654321) (← links)
- Note—On “Optimizing Field Repair Kits Based on Job Completion Rate” (Q3340472) (← links)
- (Q4837777) (← links)
- The added value of advance demand information for the planning of a repair kit (Q6100688) (← links)
- Inventory Management: An Overview, Canadian Publications, Practical Applications and Suggestions for Future Research (Q6160339) (← links)