The following pages link to (Q4354020):
Displaying 4 items.
- On integrated production-replenishment policies in single-stage manufacturing (Q1302741) (← links)
- An inventory model for manufacturing systems with delivery time guarantees. (Q1406628) (← links)
- A production-delivery lot sizing policy with stochastic delivery time and in consideration of transportation cost (Q2010062) (← links)
- Probabilistic Service Level Guarantees in Make-to-Stock Manufacturing Systems (Q3634986) (← links)