Pages that link to "Item:Q4367014"
From MaRDI portal
The following pages link to A Tabu search-based approach for scheduling job-shop type flexible manufacturing systems (Q4367014):
Displaying 14 items.
- Group-scheduling problems in electronics manufacturing (Q964869) (← links)
- Tabu search for the job-shop scheduling problem with multi-purpose machines (Q1317529) (← links)
- An enhanced tabu search algorithm to minimize a bi-criteria objective in batching and scheduling problems on unrelated-parallel machines with desired lower bounds on batch sizes (Q1652033) (← links)
- A real-time methodology for minimizing mean flowtime in FMSs with routing flexibility: threshold-based alternate routing (Q1780747) (← links)
- An improved tabu search approach for solving the job shop scheduling problem with tooling constraints (Q1917279) (← links)
- The crop growth planning problem in vertical farming (Q2031116) (← links)
- Coordinated optimization of production scheduling and maintenance activities with machine reliability deterioration (Q2171074) (← links)
- A mathematical programming-based scheduling framework for multitasking environments (Q2432894) (← links)
- Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups (Q2565776) (← links)
- Scheduling flexible manufacturing cells using Tabu Search (Q3055220) (← links)
- Production Control of a Flexible Manufacturing System in a Job Shop Environment (Q3842991) (← links)
- A priority list based heuristic for the job shop problem: part 2 tabu search (Q4661205) (← links)
- Locating Benefit Posts in Brazil (Q5289667) (← links)
- Multiple machine JIT scheduling: a tabu search approach (Q5428715) (← links)