Pages that link to "Item:Q4367030"
From MaRDI portal
The following pages link to On-line control model for network construction projects (Q4367030):
Displaying 6 items.
- Determining the timing of project control points using a facility location model and simulation (Q337592) (← links)
- A Petri net-based framework for realistic project management and scheduling: an application in animation and videogames (Q342185) (← links)
- Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach (Q872140) (← links)
- Optimal timing of project control points (Q1590030) (← links)
- Minimizing the expected makespan of a project with stochastic activity durations under resource constraints (Q2356119) (← links)
- On-line Control Model for Cost-simulation Network Projects (Q4887786) (← links)