Pages that link to "Item:Q4367245"
From MaRDI portal
The following pages link to A Branch-and-Bound Procedure for the Generalized Resource-Constrained Project Scheduling Problem (Q4367245):
Displaying 29 items.
- An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations (Q439614) (← links)
- A new lower bound for the resource-constrained project scheduling problem with generalized precedence relations (Q709101) (← links)
- Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems (Q721682) (← links)
- An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem (Q1266548) (← links)
- A multiple-tree search procedure for the resource-constrained project scheduling problem (Q1266726) (← links)
- A branch and bound algorithm for the resource-constrained project scheduling problem (Q1296084) (← links)
- A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations (Q1303751) (← links)
- Activity nets: A guided tour through some recent developments (Q1388902) (← links)
- Resource-constrained project scheduling: A survey of recent developments. (Q1406618) (← links)
- Exact and truncated branch-and-bound procedures for resource-constrained project scheduling with discounted cash flows and general temporal constraints. (Q1412119) (← links)
- Branch and bound algorithms for resource constrained project scheduling problem subject to nonrenewable resources with prescheduled procurement (Q1718808) (← links)
- A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags (Q1869389) (← links)
- Scattered branch and bound. An adaptive search strategy applied to resource-constrained project scheduling (Q1969542) (← links)
- A partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints (Q2152012) (← links)
- A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints (Q2197158) (← links)
- Considering project management activities for engineering design groups (Q2226486) (← links)
- Reduction method based on a new fuzzy rough set in fuzzy information system and its applications to scheduling problems (Q2475925) (← links)
- Project selection, scheduling and resource allocation with time dependent returns (Q2519075) (← links)
- A branch-and-bound algorithm for RCPSP with variable resource requirements and variable multiple resource availability constraints (Q2720679) (← links)
- Scheduling Resource-Constrained Projects Competitively at Modest Memory Requirements (Q3116759) (← links)
- Une méthode arborescente pour résoudre les problèmes cumulatifs (Q3360656) (← links)
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (Q4032492) (← links)
- (Q4201451) (← links)
- A Branch and Bound Procedure for the Resource Constrained Project Scheduling Problem with Discounted Cash Flows (Q4363602) (← links)
- A review of the contribution of operational research to project management (Q5955087) (← links)
- An iterative time‐bucket refinement algorithm for a high‐resolution resource‐constrained project scheduling problem (Q6066724) (← links)
- A constructive branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints (Q6102850) (← links)
- A branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer times (Q6109310) (← links)
- A chance-constrained optimization approach integrating project scheduling and material ordering to manage the uncertain material supply (Q6568413) (← links)