Pages that link to "Item:Q4367270"
From MaRDI portal
The following pages link to Activity Delay in Stochastic Project Networks (Q4367270):
Displaying 27 items.
- Predetermined intervals for start times of activities in the stochastic project scheduling problem (Q646669) (← links)
- A two-stage stochastic programming approach for project planning with uncertain activity durations (Q835555) (← links)
- An optimization model for stochastic project networks with cash flows (Q867428) (← links)
- Maximizing the net present value of a project under uncertainty (Q1039778) (← links)
- Scheduling projects with stochastic activity duration to maximize expected net present value (Q1042042) (← links)
- Stochastic project networks. Temporal analysis, scheduling and cost minimization (Q1202111) (← links)
- On the optimal management of project risk (Q1296106) (← links)
- Improving project cost estimation by taking into account managerial flexibility (Q1590029) (← links)
- New strategies for stochastic resource-constrained project scheduling (Q1617288) (← links)
- Computing project makespan distributions: Markovian PERT networks revisited (Q1634063) (← links)
- The preemptive stochastic resource-constrained project scheduling problem (Q1735185) (← links)
- Maximizing the expected net present value of a project with phase-type distributed activity durations: an efficient globally optimal solution procedure (Q1754200) (← links)
- The risk of delay of a project in terms of the morphology of its network (Q1806754) (← links)
- Sharing delay costs in stochastic scheduling problems with delays (Q2026709) (← links)
- Maximizing the expected net present value in a project with uncertain cash flows (Q2239980) (← links)
- Scheduling Markovian PERT networks to maximize the net present value (Q2270324) (← links)
- Minimizing the expected makespan of a project with stochastic activity durations under resource constraints (Q2356119) (← links)
- Scheduling Markovian PERT networks to maximize the net present value: new results (Q2417109) (← links)
- Project planning with alternative technologies in uncertain environments (Q2630099) (← links)
- A surrogate indicator of criticality for stochastic project networks (Q3156288) (← links)
- Seeking optimum project duration extensions (Q3157350) (← links)
- Some remarks on the expected delay of project duration in a PERT network (Q3346077) (← links)
- Setting gates for activities in the stochastic project scheduling problem through the cross entropy methodology (Q5894527) (← links)
- Mapping distinctive competencies: a systemic approach (Q5894905) (← links)
- Setting gates for activities in the stochastic project scheduling problem through the cross entropy methodology (Q5919228) (← links)
- Designing practical coordinating contracts in decentralized projects (Q6052544) (← links)
- Maximizing the net present value of a project under uncertainty: activity delays and dynamic policies (Q6572829) (← links)