Pages that link to "Item:Q4368707"
From MaRDI portal
The following pages link to A numerical method in optimal production and setup scheduling of stochastic manufacturing systems (Q4368707):
Displaying 21 items.
- Control of production and corrective maintenance rates in a multiple-machine, multiple-product manufacturing system (Q597490) (← links)
- Production planning of a failure-prone manufacturing system under different setup scenarios (Q670254) (← links)
- Near optimal control for a class of stochastic hybrid systems (Q710711) (← links)
- Infinitesimal perturbation analysis and optimization for make-to-stock manufacturing systems based on stochastic fluid models (Q853683) (← links)
- Hierarchical decision making in production and repair/replacement planning with imperfect repairs under uncertainties (Q1027605) (← links)
- Setup scheduling of manufacturing systems as the art of juggling (Q1304055) (← links)
- Using stochastic optimization to determine threshold values for the control of unreliable manufacturing systems (Q1342461) (← links)
- Failure-prone manufacturing systems with setups: feasibility and optimality under various hypotheses about perturbations and setup interplay (Q1639514) (← links)
- A three-stage optimization algorithm for the stochastic parallel machine scheduling problem with adjustable production rates (Q1956018) (← links)
- Production control problem with semi-Markov jump under stochastic demands and deteriorating inventories (Q2109512) (← links)
- Considering human error in optimizing production and corrective and preventive maintenance policies for manufacturing systems (Q2289155) (← links)
- Simultaneous control of production, preventive and corrective maintenance rates of a failure-prone manufacturing system (Q2469138) (← links)
- Stability and optimality of a multi-product production and storage system under demand uncertainty (Q2470104) (← links)
- Dynamic modeling and control of supply chain systems: A review (Q2483501) (← links)
- A numerical method to approximate optimal production and maintenance plan in a flexible manufacturing system (Q2573557) (← links)
- ASTMOPF: Ein allgemeines stochastisches modell für die Optimierung von Fertigungsprozessen (Q3741380) (← links)
- Numerical investigation of optimal policies for production flow control and set-up scheduling: Lessons from two-part-type failure-prone FMSs (Q4252098) (← links)
- Production and set-up control of a failure-prone manufacturing system (Q4823564) (← links)
- Operational level-based policies in production rate control of unreliable manufacturing systems with set-ups (Q5478826) (← links)
- Optimal production and setup scheduling: A one-machine, two-product system (Q5933822) (← links)
- An impulse control problem of a production model with interruptions to follow stochastic demand (Q5938399) (← links)