Pages that link to "Item:Q439614"
From MaRDI portal
The following pages link to An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations (Q439614):
Displaying 15 items.
- On the efficient modeling and solution of the multi-mode resource-constrained project scheduling problem with generalized precedence relations (Q280157) (← links)
- Resource levelling in project scheduling with generalized precedence relationships and variable execution intensities (Q280170) (← links)
- An effective approach for scheduling coupled activities in development projects (Q319026) (← links)
- A min-flow algorithm for minimal critical set detection in resource constrained project scheduling (Q456733) (← links)
- PROGRESS: Optimally solving the generalized resource-constrained project scheduling problem (Q1401645) (← links)
- Minimizing the completion time of a project under resource constraints and feeding precedence relations: an exact algorithm (Q1935550) (← links)
- A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints (Q2197158) (← links)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem (Q2242185) (← links)
- An exact algorithm for the resource-constrained project scheduling problem based on a new mathematical formulation (Q2783969) (← links)
- A new formulation of the resource-unconstrained project scheduling problem with generalized precedence relations to minimize the completion time (Q3064043) (← links)
- An iterative time‐bucket refinement algorithm for a high‐resolution resource‐constrained project scheduling problem (Q6066724) (← links)
- Resource leveling in projects with flexible structures (Q6099408) (← links)
- A branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer times (Q6109310) (← links)
- A branch-and-bound algorithm for the proactive resource-constrained project scheduling problem with a robustness maximization objective (Q6568412) (← links)
- A chance-constrained optimization approach integrating project scheduling and material ordering to manage the uncertain material supply (Q6568413) (← links)