The following pages link to (Q4452938):
Displaying 5 items.
- A heuristic method for RCPSP with fuzzy activity times (Q621664) (← links)
- A branch-and-bound algorithm with fuzzy inference for a permutation flowshop scheduling problem (Q1278537) (← links)
- A branch and bound based heuristic for multi-product resource constrained scheduling problem in FMS environment (Q1806642) (← links)
- Solving constrained flow-shop scheduling problem through multistage fuzzy binding approach with fuzzy due dates (Q2092700) (← links)
- A computationally efficient branch-and-bound algorithm for the permutation flow-shop scheduling problem (Q2178110) (← links)