The following pages link to (Q4519509):
Displaying 3 items.
- Optimisation of fault-tolerant fabric-cutting schedules using genetic algorithms and fuzzy set theory (Q857327) (← links)
- A new approach to two-machine flow shop problem with uncertain processing times (Q862510) (← links)
- Fuzzy Gilmore and Gomory algorithm: Application in robotic flow shops with the effects of job-dependent transportation and set-ups (Q5002310) (← links)